Micro Mini Small Water Francis Pelton Turgo Kaplan Hydro Hydraelectric Turbine Permanent Magnet Generator Alternator EPC
Product Details:
Place of Origin: | China |
Brand Name: | Wawushan |
Certification: | ISO9001 |
Model Number: | ZDJP-010 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 |
---|---|
Price: | negotiable |
Packaging Details: | plywood |
Delivery Time: | 180 wordking days |
Payment Terms: | T/T |
Supply Ability: | 1+unit+4 months |
Detail Information |
|||
Runner Material: | Stainless Steel | Guide Vane: | Stainless Steel |
---|---|---|---|
Layout Pattern: | Adjustable | Runner Blade: | Fixed |
Runner Diameter: | 0.65m | Housing: | Carbon Steel |
Highlight: | 400kw Kaplan Vertical Hydro Turbine,adjustable Vertical Hydro Turbine,400kw turgo turbine generator |
Product Description
vertical 300kw Kaplan hydro turbine for micro power plant
overview
We supply a double regulation system of fixed blade and adjustable blade With a double regulation system, Kaplan turbines provide high efficiency
over a broad range of configurations
The vertical configuration of the Kaplan turbine allows for larger runner diameters (above 10 m) and increased unit power.
Our Kaplan turbines also keep the environment in mind. Engineered with a "fish-friendly“ structure, to improve the survival rate of migrating species,
and water-lubricated bearings and water-filled hubs to prevent water pollution.
Our Kaplan turbines are constructed with oil-free hubs where the oil traditionally filling the hub has been replaced by water and all brushes are made
of self-lubricating material. This eliminates the risk of oil leakage in the water.
1.The package of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b.Regular maintenance and inspection
c.Technical Training Program for Power Plant Personnel
d.General Overhaul
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant
c.Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.
Specification
Name | 400kw Pelton Hydro Turbine Generator |
Water Head | 8.5 m |
Runner Diameters | 0.65m |
Capacity | 400KW |
Frequency | 50HZ |
Generator Voltage | 400V |
Layout pattern | vertical |
Material(blades) | Stainless Steel ZG0Cr13Ni4Mo |
Excitation | Brushless |
Generator Insulation | F/F |
Lifespan | 50 years |
Why choose us?
1. More than 20 years of industry experience, install commissioning more than 150 equipment each year
2. Provide complete proposal for hydro power plant from water to wire
3. Abundant foreign power plant project implementation experience such as France, Japan, USA, South Africa, Sri Lanka, Iran, Southeast Asia
4. Design and manufacture of hydro power generator with voltage 400V,6.3KV . capacity exceed 1000kw with 400V
FAQ
1.You are a trading company or a manufacture?
We are a hydro turbine generator manufacture with over 20 years of experiences, Our factory is in the Sichuan you will take 2 hours driving after you reach Shuangliu Airport, pay a visit to our factory you will know more about us.
2.What Kind of water turbine should I choose?
We need to know water head, flow rate, voltage level, frequency, on-grid or off-grid running, automation level from you to work out the solution
3: Can you do the EPC for the hydro power plant?
Yes, We can design, producing and install the equipment, we will dispatch technologist and workers to install the equipment.