Vertical Kaplan Horizontal Hydro Turbine Adjustable Runner Blade Brushless
Product Details:
Place of Origin: | China |
Brand Name: | Wawushan |
Model Number: | ZDJP-010 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 |
---|---|
Price: | negotiable |
Packaging Details: | plywood |
Delivery Time: | 180 wordking days |
Payment Terms: | T/T |
Supply Ability: | 1+unit+4 months |
Detail Information |
|||
Runner Material: | Stainless Steel | Guide Vane: | Stainless Steel |
---|---|---|---|
Layout: | Vertical | Runner Blade: | Adjustable |
Runner Diameter: | 0.9 M | Flow: | 5.31 M³/s |
High Light: | Vertical Kaplan Horizontal Hydro Turbine,Brushless Horizontal Hydro Turbine,Kaplan low head hydroelectric turbine |
Product Description
Vertical 500kw Water Kaplan Turbine Generator For Micro Power Plant
overview
Kaplan turbine is a kind of turbine suit to low water head 2-30 meters, and with certain big flow, normally divided into fixed blades and adjustable blades turbine. Main components including: runner, draft cone, water chamber, guide vane, bearing, and main shaft. The spiral case could be steel or concrete. The runner diameter we can manufacture is from 60cm to 4meters, with rated output 50Kw to 20Mw.
Turbine units normally be vertical shaft arrangement. Generator equipped with same or different shaft, with Anyway, they will share the same rotating speed. If specially specially required, a speed increase gear could be equipped between turbine and generator in order to smaller the generator size.
Standard followed as below:
- GB/T15468-95 Fundamental technical requirements for hydraulic turbine
- GB10969-95 Specifications for water passage components of hydraulic turbines neq IEC 193No.1:1977
- GB/T7894-2001 Fundamental technical requirements for hydraulic turbine generator
- GB9652-95 Specifications of governors and pressure oil supply units for hydraulic turbines
- GB10585-97 Fundamental requirements of excitation system for medium and small generators
- GB11805-97 Fundamental technical requirements for automatic control components and their related system for medium and small hydro generating sets
- GB8564-97 Specifications for installation of hydraulic-turbine and generator units
- GB/T15469-95 Cavitation pitting evaluation in reaction trubines
- JB/DQ1428-97 Quality grading for medium and small hydraulic turbines
- JBT6752-93 Specifications for static balancing test of medium and small hydraulic turbine runner
- JBDQ3467-97 Quality grading for medium and small hydraulic turbine generators
- GB/T14478-1993 Fundamental technical requirements for large and medium inlet valves of hydraulic turbines
- JB/T8527-1989 Metal sealed butterfly valve
- JB/T5299-1998 Hydraulic control slow-closing butterfly valve
Specification
Name | 500kw Water Kaplan Turbine Generator |
Water Head | 12.0m |
Runner Diameters | 0.9 m |
Capacity | 6000KW |
Frequency | 50HZ |
Generator Voltage | 400V |
Layout pattern | vertical |
Material(blades) | Stainless Steel ZG0Cr13Ni4Mo |
Excitation | Brushless |
Generator Insulation | F/F |
Lifespan | 50 years |
Why choose us?
1. More than 20 years of industry experience, install commissioning more than 150 equipment each year
2. Provide complete proposal for hydro power plant from water to wire
3. Abundant foreign power plant project implementation experience such as France, Japan, USA, South Africa, Sri Lanka, Iran, Southeast Asia
4. Design and manufacture of hydro power generator with voltage 400V,6.3KV . capacity exceed 1000kw with 400V
FAQ
1. You are a trading company or a manufacture?
We are a hydro turbine generator manufacture with over 20 years of experiences, Our factory is in the Sichuan you will take 2 hours driving after you reach Shuangliu Airport, pay a visit to our factory you will know more about us.
2. What Kind of water turbine should I choose?
We need to know water head, flow rate, voltage level, frequency, on-grid or off-grid running, automation level from you to work out the solution
3: Can you do the EPC for the hydro power plant?
Yes, We can design, producing and install the equipment, we will dispatch technologist and workers to install the equipment.