Reliable Horizontal Hydro Electric Turbine 250kw Extended Lifetime
Product Details:
Place of Origin: | China |
Brand Name: | Wawushan |
Model Number: | SF-010 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 |
---|---|
Price: | negotiable |
Packaging Details: | plywood |
Delivery Time: | 180 wordking days |
Payment Terms: | T/T |
Supply Ability: | 1+unit+4 months |
Detail Information |
|||
Shaft: | Forged Steel | Layout: | Vertical |
---|---|---|---|
Insulation Class: | F/F | Excitation: | Brushless |
Voltage: | 400v | Capacity: | 250kw |
Highlight: | Reliable horizontal Hydro Electric Turbine,Hydro Electric Turbine 250kw,250kw river water turbine generator |
Product Description
250kw Hydro Electric Turbine For Micro Hydro Power Plant
Overview
All of our medium and large hydro generators are engineered to reduce thermo-mechanical stress on the generator structure, which contributes to
improved reliability and extended lifetime. Additionally, our generators come with a stator core pressing system to ensure that pressing force is
provided precisely where it is needed: in the core.
A closed loop air ventilation circuit is standard with our machines and, when necessary for the site conditions and generator
configuration, we offer state-of-the-art cooling systems.
Specification
Name | 250kw water turbine generator |
Capacity2 | 250KW |
Frequency | 50HZ |
Generator Voltage | 400V |
Layout pattern | horizontal |
Material(coil) | copper |
Excitation | Brushless |
Generator Insulation | F/F |
Lifespan | 50 years |
our service package as follows
1. The Argumentation of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3. Equipment Purchase& Transportation
a. Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling) (Optional)
b. Regular maintenance and inspection (Optional)
c. Technical Training Program for Power Plant Personnel (Optional)
d. General Overhaul (Optional)
6. Installation & Testing
a. Installation & testing for all systems & equipment provided by Runh Power
b. Installation, testing & trail run of all systems of a power plant (Optional)
c. Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.(