logo
<
quality Forged Steel Mini Hydro Water Turbine Generator Brushless 2500kw factory
quality Forged Steel Mini Hydro Water Turbine Generator Brushless 2500kw factory
>

Forged Steel Mini Hydro Water Turbine Generator Brushless 2500kw

Forged Steel Mini Hydro Water Turbine Generator Brushless 2500kw
2500kwmini Hydro Generator For Micro Hydro Power Plant overview Hydro-generating unit is the key power equipment in the hydropower plant. The hydro generator is a device that converts the rotating mechanical energy of a hydro-turbine into electrical energy through a main shaft connected to the hydro...
Place of Origin:China
Brand Name:WaWuShan
Certification:ISO
Model Number:SFW-200KW (2000KW)
Minimum Order Quantity:1
Price:200000
Product Custom Attributes
Highlight

Forged Steel hydro water turbine generator

,

Hydro Water Turbine Generator 2500kw

,

2500kw hydroelectric power turbine

Shaft:
Forged Steel
Layout:
Vertical
Insulation Class:
F/F
Excitation:
Brushless
Voltage:
6300v
Capacity:
2500kw
Material:
Copper
Product Description

2500kwmini Hydro Generator For Micro Hydro Power Plant

 

overview 

 

Hydro-generating unit is the key power equipment in the hydropower plant.

The hydro generator is a device that converts the rotating mechanical energy of a hydro-turbine into electrical energy through a main shaft connected to the hydro-turbine runner. two different mount for generator of vertical and horizontal which could be operated at brushless excitation and thyristor excitation. the hydro generator has usually used air as medium to cool its stator, rotor winding and iron core.

 

Specification

 

Name 2500kw Hydropower Electricity Turbine Generator
Capacity2 2500KW
Frequency 50HZ
Generator Voltage 6300V
Layout pattern vertical
Material(coil) copper
Excitation Brushless
Generator Insulation F/F
Lifespan 50 years
 

 

our service package for hydro power plant

 

1. The Argumentation of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3. Equipment Purchase& Transportation
a. Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling) (Optional)
b. Regular maintenance and inspection (Optional)
c. Technical Training Program for Power Plant Personnel (Optional)
d. General Overhaul (Optional)
6. Installation & Testing
a. Installation & testing for all systems & equipment provided by Runh Power
b. Installation, testing & trail run of all systems of a power plant (Optional)
c. Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.(

Forged Steel Mini Hydro Water Turbine Generator Brushless 2500kw 0

Forged Steel Mini Hydro Water Turbine Generator Brushless 2500kw 1

Forged Steel Mini Hydro Water Turbine Generator Brushless 2500kw 2

Forged Steel Mini Hydro Water Turbine Generator Brushless 2500kw 3