High Speed SS Turgo Water Wheel High Strength Long Lifespan 1.1m
Product Details:
Place of Origin: | China |
Brand Name: | Wawushan |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 |
---|---|
Price: | negotiable |
Packaging Details: | plywood |
Delivery Time: | 120 wordking days |
Payment Terms: | T/T |
Supply Ability: | 1+unit+4 months |
Detail Information |
|||
Runner Material: | Stainless Steel | Dimension: | 1.1 M |
---|---|---|---|
Machine Type: | Turgo | Blade No: | 20 PCS |
Weight: | 900 Kg | Brand: | Wawushan |
High Light: | SS Turgo Water Wheel,Turgo Water Wheel 1.1m,High Speed SS Hydro Turbine Wheel |
Product Description
Stainless Steel Turgo Wheel Turbine
The operation of a Turgo turbine is very similar to that of a Pelton turbine. In this type of turbine, high speed jets of water emerge from the nozzles that surround the turbine. These nozzles are arranged so the water jet will hit the buckets on one side at an angle of around 20°.This shallow angle allows the water stream to exit on the other side instead of being diverted backwards. Since the incoming and outgoing jets don't interfere like they do in Pelton turbines, this type of turbine is able to accommodate a higher flow rate.
Polishing based on CMM measurement report
Experienced employees polishing according to customer specific procedures
Several dimensional and quality controls through process
Compliance with all environmental standards thanks to the newest filtering technologies
Completed products are checked using four non-destructive testing methods (NDT).
Visual Testing (VT)
Liquid Penetrant Testing (PT)
Magnetic Particle Testing (MT)
Ultrasonic Testing (UT)
The actual unbalance is displayed in one or two planes by graphical and numerical output. There is also a deviation from the allowed unbalance displayed and a suggestion for the most convenient weight correction.
specification
runner material | stainless steel |
runner type | Turgo |
diameter | 1.1m |
capacity | 500kw |
blade No | 20PCS |
weight | 900KG |
The package of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b.Regular maintenance and inspection
c.Technical Training Program for Power Plant Personnel
d.General Overhaul
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant
c.Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.