Forged Steel Hydro Turbine Generators 50HZ Micro Hydro Power Generator
forged steel Hydro Turbine Generators
,50HZ Micro Hydro Power Generator
,50HZ hydroelectric motor generator
500kw Micro Hydro Power Generator For Micro Hydro Power Plant
overview
medium and large hydro generators are designed for run-of-river and high head hydropower plants.
Our knowledge and experience in Hydropower allows our team to match customers with the best technology for their site.
Low-speed machines ideal for run-of-river plants in connection Kaplan turbines; and High-speed machines used with Francis and Pelton turbines for high head hydro power
Specification
| Name | 500kw hydro turbine generator |
| Capacity2 | 500KW |
| Frequency | 50HZ |
| Generator Voltage | 400V |
| Layout pattern | horizontal |
| Material(coil) | copper |
| Excitation | Brushless |
| Generator Insulation | F/F |
| Lifespan | 50 years |
1.The Argumentation of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling) (Optional)
b.Regular maintenance and inspection (Optional)
c.Technical Training Program for Power Plant Personnel (Optional)
d.General Overhaul (Optional)
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant (Optional)
c.Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.(