logo
<
quality Forged Steel Hydro Turbine Generators 50HZ Micro Hydro Power Generator factory
quality Forged Steel Hydro Turbine Generators 50HZ Micro Hydro Power Generator factory
>

Forged Steel Hydro Turbine Generators 50HZ Micro Hydro Power Generator

Forged Steel Hydro Turbine Generators 50HZ Micro Hydro Power Generator
500kw Micro Hydro Power Generator For Micro Hydro Power Plant overview medium and large hydro generators are designed for run-of-river and high head hydropower plants. Our knowledge and experience in Hydropower allows our team to match customers with the best technology for their site. Low-speed ...
Place of Origin:China
Brand Name:WaWuShan
Certification:ISO
Model Number:SFW-200KW (2000KW)
Minimum Order Quantity:1
Price:200000
Product Custom Attributes
Highlight

forged steel Hydro Turbine Generators

,

50HZ Micro Hydro Power Generator

,

50HZ hydroelectric motor generator

Shaft:
Forged Steel
Layout:
Horizontal
Insulation Class:
F/F
Excitation:
Brushless
Voltage:
6300v
Capacity:
500kw
Material:
Copper
Product Description

500kw Micro Hydro Power Generator For Micro Hydro Power Plant

 

overview 

 

medium and large hydro generators are designed for run-of-river and high head hydropower plants.

Our knowledge and experience in Hydropower allows our team to match customers with the best technology for their site. 

Low-speed machines ideal for run-of-river plants in connection Kaplan turbines; and High-speed machines used with Francis and Pelton turbines for high head hydro power

 

 

Specification

 

Name 500kw hydro turbine generator
Capacity2 500KW
Frequency 50HZ
Generator Voltage 400V
Layout pattern horizontal
Material(coil) copper
Excitation Brushless
Generator Insulation F/F
Lifespan 50 years
 

 

1.The Argumentation of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling) (Optional)
b.Regular maintenance and inspection (Optional)
c.Technical Training Program for Power Plant Personnel (Optional)
d.General Overhaul (Optional)
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant (Optional)
c.Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.(

Forged Steel Hydro Turbine Generators 50HZ Micro Hydro Power Generator 0

Forged Steel Hydro Turbine Generators 50HZ Micro Hydro Power Generator 1

Forged Steel Hydro Turbine Generators 50HZ Micro Hydro Power Generator 2

Forged Steel Hydro Turbine Generators 50HZ Micro Hydro Power Generator 3