Forged Steel Hydro Turbine Generators 50HZ Micro Hydro Power Generator
Product Details:
Place of Origin: | China |
Brand Name: | Wawushan |
Model Number: | SF-011 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 |
---|---|
Price: | negotiable |
Packaging Details: | plywood |
Delivery Time: | 180 wordking days |
Payment Terms: | T/T |
Supply Ability: | 1+unit+4 months |
Detail Information |
|||
Shaft: | Forged Steel | Layout: | Horizontal |
---|---|---|---|
Insulation Class: | F/F | Excitation: | Brushless |
Voltage: | 6300v | Capacity: | 500kw |
Highlight: | forged steel Hydro Turbine Generators,50HZ Micro Hydro Power Generator,50HZ hydroelectric motor generator |
Product Description
500kw Micro Hydro Power Generator For Micro Hydro Power Plant
overview
medium and large hydro generators are designed for run-of-river and high head hydropower plants.
Our knowledge and experience in Hydropower allows our team to match customers with the best technology for their site.
Low-speed machines ideal for run-of-river plants in connection Kaplan turbines; and High-speed machines used with Francis and Pelton turbines for high head hydro power
Specification
Name | 500kw hydro turbine generator |
Capacity2 | 500KW |
Frequency | 50HZ |
Generator Voltage | 400V |
Layout pattern | horizontal |
Material(coil) | copper |
Excitation | Brushless |
Generator Insulation | F/F |
Lifespan | 50 years |
1.The Argumentation of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling) (Optional)
b.Regular maintenance and inspection (Optional)
c.Technical Training Program for Power Plant Personnel (Optional)
d.General Overhaul (Optional)
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant (Optional)
c.Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.(