550KW Stainless Steel Runner Turgo Impulse Turbine with 103m Head for Micro Hydro Generator
Product Details:
| Place of Origin: | China |
| Brand Name: | Wawushan |
| Certification: | ISO9001 |
| Model Number: | XJ-015 |
Payment & Shipping Terms:
| Minimum Order Quantity: | 1 |
|---|---|
| Price: | negotiable |
| Packaging Details: | plywood |
| Delivery Time: | 120 wordking days |
| Payment Terms: | T/T |
| Supply Ability: | 1+unit+4 months |
|
Detail Information |
|||
| Runner Material: | Stainless Steel | Body: | Steel Casting |
|---|---|---|---|
| Capacity: | 550kw | Runner Dia: | 0.61m |
| Flow: | 0.64 | Head: | 103m |
| Highlight: | Long Lifespan Turgo Wheel Turbine,ISO9001 Turgo Wheel Turbine,Long Lifespan turgo wheel generator |
||
Product Description
550kW Turgo Wheel Turbine for Micro Hydro Generator
We supply complete hydraulic turbine systems including Kaplan, propeller, Francis, Pelton, and Turgo turbines, along with speed governors, generators, valves, excitation systems, and accessories. Our manufacturing process adheres to ISO9001 quality management standards with advanced testing equipment to ensure product excellence.
Product Features
- Deflector speed control for fast response to load/frequency changes
- Modular design approach for flexibility
- Customizable turbine design, layout, and configuration
- No penstock surge during load changes or emergency shutdowns
- Operational capability down to 10% of rated flow
- Higher annual energy potential compared to reaction turbines
- Superior performance during low flow periods
Technical Specifications
| Product Name | 550kW Turgo Wheel Turbine |
| Water Head | 103.0m |
| Runner Diameters | 0.64 m |
| Capacity | 550KW |
| Frequency | 50HZ |
| Generator Voltage | 400V |
| Layout Pattern | Vertical |
| Blade Material | Stainless Steel ZG0Cr13Ni4Mo |
| Excitation | Brushless |
| Generator Insulation | F/F |
| Lifespan | 50 years |
Performance Advantages
- Bridges the gap between Francis and Pelton turbine applications
- Limits over-pressure effects on the penstock
- Higher operating speeds reduce weight and cost
- Maintains efficiency across wide flow ranges
- Excellent abrasion resistance
- Simple operation and maintenance procedures
Project Implementation Services
1. Project Documentation
- Document verification and review
- Authority approval processing
- Contract execution
2. Engineering Design
- Complete equipment selection based on requirements
- Comprehensive layout and subsystem design
- Project team selection
- Technical solution submission and approval
3. Equipment & Transportation
- Turbine generator sets and auxiliary systems
- Construction materials, tools, and spare parts
4. Civil Construction
Complete civil construction within power plant parameters
5. Operation & Maintenance
- Power plant operational support
- Scheduled maintenance and inspections
- Technical training programs
- General overhaul services
6. Installation & Testing
- Complete system installation and testing
- Power plant trial runs and commissioning
7. Spare Parts Supply
Long-term supply of spare parts and consumables
Product Images
Want to Know more details about this product



