Micro Mini Small Water Francis Pelton Turgo Kaplan Hydro Hydroelectric Turbine Permanent Magnet Generator alter
Product Details:
Place of Origin: | China |
Brand Name: | Wawushan |
Certification: | ISO9001 |
Model Number: | ZDJP-017 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 |
---|---|
Price: | negotiable |
Packaging Details: | plywood |
Delivery Time: | 180 wordking days |
Payment Terms: | T/T |
Supply Ability: | 1+unit+4 months |
Detail Information |
|||
Runner Material: | Stainless Steel | Voltage: | 6300V |
---|---|---|---|
Layout: | Vertical | Runner Blade: | Adjustable |
Runner Diameter: | 1.6 M | Flow: | 27.50 M³/s |
High Light: | 28m Head Kaplan Water Turbine,6300V vertical Kaplan Water Turbine,28m Head mini kaplan turbine |
Product Description
Vertical 4000kw Water Kaplan Wheel Turbine Generator For Micro Power Plant
overview
A Kaplan turbine is basically a propeller with adjustable blades inside a tube. It is an axial-flow turbine, which means that the flow direction does not change as it crosses the rotor.
Kaplan Turbine works on the principle of axial flow reaction. In axial flow turbines, the water flows through the runner along the direction parallel to the axis of rotation of the runner. The water at the inlet of the turbine possesses both kinetic energy as well as pressure energy for effective rotation the blades in a hydro-power station.
Application of Kaplan Turbine
Kaplan turbines are widely used throughout the world for electrical power production.
It can work more efficiently at low water head and high flow rates as compared with other types of turbines.
It is smaller in size and easy to construct.
The efficiency of Kaplan turbine is very high as compares with other hydraulic turbine.
Specification
Name | Vertical 6000kw Water Kaplan Wheel Turbine Generator |
Water Head | 28.0m |
Runner Diameters | 1.6m |
Capacity | 7000KW |
Frequency | 50HZ |
Generator Voltage | 400V |
Layout pattern | vertical |
Material(blades) | Stainless Steel ZG0Cr13Ni4Mo |
Excitation | Brushless |
Generator Insulation | F/F |
Lifespan | 50 years |
The package of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b.Regular maintenance and inspection
c.Technical Training Program for Power Plant Personnel
d.General Overhaul
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant
c.Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.
Why choose us?
1. More than 20 years of industry experience, install commissioning more than 150 equipment each year
2. Provide complete proposal for hydro power plant from water to wire
3. Abundant foreign power plant project implementation experience such as France, Japan, USA, South Africa, Sri Lanka, Iran, Southeast Asia
4. Design and manufacture of hydro power generator with voltage 400V,6.3KV . capacity exceed 1000kw with 400V
FAQ
1.You are a trading company or a manufacture?
We are a hydro turbine generator manufacture with over 20 years of experiences, Our factory is in the Sichuan you will take 2 hours driving after you reach Shuangliu Airport, pay a visit to our factory you will know more about us.
2.What Kind of water turbine should I choose?
We need to know water head, flow rate, voltage level, frequency, on-grid or off-grid running, automation level from you to work out the solution
3: Can you do the EPC for the hydro power plant?
Yes, We can design, producing and install the equipment, we will dispatch technologist and workers to install the equipment.